Synthetic / Cold Asphalt Repair

Why Synthetic Asphalt?

1. Ready for traffic within 2 hours.

2. Cold patch has a very slow hardening time. Synthetic asphalt has a rapid hardening time and is ready for traffic in two hours or less versus cold patch driveway asphalt that is not accessible in that time frame. The process for cold asphalt being ready takes much longer simply because it contains oils that must work itself out and will not adhere to sealcoating properly at time of installation. 

•♣•♣•♣•

 

Synthetic Asphalt Repair Job Specifications:


Cold patch driveway / asphalt repair area(s) will be cleaned & prepped using a rotary or manual broom with high tensile strength steel bristles (If needed) and torched at 250,000 BTUs on all asphalt edges and other points of abutment to help secure a tight bond. Old material will be trucked from the site unless otherwise specified. The excavated area will be mechanically tamped and if an unstable sub-base is encountered during preparation, additional excavation and material will need to be completed. This additional work, at an additional cost will only be completed upon customer consent. If additional work is needed and customer does not give consent guarantee will be null & void. 

Up to 3" of Synthetic asphalt will be compressed over the prepared area(s).  The compressed material will consist of (I -5) fabc top course. Repair can be sealcoated immediately. If topsoil is needed to be spread along the edge of the asphalt repair it will be the customer's responsibility. This repair will carry a two year guarantee. If synthetic asphalt is used in a crack(s) no guarantee is extended.

Related Blog Articles: